Skip to content

Marshall Road Marshall Road, Abbotsford, BC

Completed in 2019

The City of Abbotsford wanted the Marshall road extension to join. Due to the steep slope, the construction of a gridded MSE wall wouldn’t work to install. The grid requires a 40 foot wall and chasing the hillside. The cut slope would be over 100 feet tall. The use of shotcrete wasn’t preferred, as the material behind the shotcrete could become unstable. As excavation was done, the use of temporary shoring and Ankora’s tie back system met the requirements of the geotechnical engineer. Ankroa was the preferred retaining wall system.

Project Gallery

Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project
Marshall Road Abbotsford Ankora Wall Project

Questions?

If you are an Engineer, Installer, Developer or Producer interested in learning more about the Ankora Retaining Wall System or would like to work with Ankora on your next project, please feel free to call or email our team.

Back To Top